NuScale Power Corporation

SMR · Industrials · $3.35
✦ AI ANALYSIS — not investment advice
SELL Medium conviction 6-12 months
$3.33target
↘ 0.6% below the current $3.35

SELL: $1.9B of liquidity and real manufacturing progress do not justify a $1.6B equity value while revenue is $0.3M per quarter, no binding customer order exists, and valuation is 573.05x TTM sales.

Confidence high
◆Investment thesis

NuScale is a financing-supported technology option, not yet an operating power-equipment business. The market is pricing an eventual fleet of modules, recurring engineering revenue, and AI-linked demand for firm power. What remains missing is the contract that converts those possibilities into a revenue schedule, margin profile, and cash-pay timeline. The valuation is especially hard to defend because TTM P/S is 573.05x, versus 2.2x for peers, while the comparable set itself is a poor valuation anchor: peer P/E averages 14.5x but spans a 7.8x dispersion and includes businesses with established earnings that NuScale does not possess.

The positive case is tangible, not imaginary. NuScale has regulatory lead time, a deep manufacturing ecosystem, and enough liquidity to move from design readiness into fabrication. Those are valuable assets in a market where utilities and hyperscalers increasingly need dispatchable, carbon-free capacity. But nuclear development does not monetize when designs are approved or suppliers are engaged. It monetizes when a creditworthy customer signs an offtake structure, construction starts, and modules are delivered at a return above their accumulated engineering and inventory costs. Management explicitly says margin clarity comes only once an order and OEM agreement exist.

The shares have already suffered a severe reset, falling from $23.35 to $3.35 over the 52-week range. That limits enthusiasm for pressing a short on price momentum alone and explains the near-term HOLD stance. It does not create a reason to own the stock outright. The heavily shorted float can produce abrupt upside on any commercial announcement, but that is a catalyst trade rather than evidence of intrinsic earnings power.

The SELL rests on three requirements that are presently unfulfilled: a binding TVA or other customer order, disclosed unit economics and margin terms, and evidence that the commercial program can grow without persistent large cash outflows. Until those arrive, the market is valuing an option on a successful SMR rollout as though commercial conversion were substantially de-risked. It is not.

⋔Scenarios · 6-12 months
$1.50bear · 40%
$3.33base · 40%
$8.00bull · 20%
Bull

A binding TVA or hyperscaler-backed PPA and an OEM agreement validate module demand, triggering a sharp reassessment of contracted future revenue.

Base

Liquidity preserves the platform and fabrication advances, but contract timing remains too uncertain to support value above the engine's sales-quality blend target.

Bear

No TVA PPA or binding order emerges, leaving minimal revenue and continued cash consumption against a 573.05x TTM sales valuation.

⊚Signal check
AISELL
QuantHOLD
AnalystsHold
aligned

Quant call aligns with analyst consensus (Hold: 3 buy / 2 hold / 3 sell).

◑Quality & risk
51Quality
53Risk
Quality factors
Innovation100
Financial health96
Profitability50
Cash flow50
Valuation48
Growth36
Shareholder17
Sentiment8
Risk drivers · Moderate
Market43%
Execution30%
Valuation25%
Financial2%
futuregrowthmomentum
We don't buy stocks where they are, we buy them where they're going.
— Steve Cohen
→Forward outlook

Forward earnings power cannot yet support a forward P/E because management provided no formal financial guidance and there are no disclosed contracted module economics or margin terms. The current moat is regulatory and engineering based, centered on the only NRC-approved design, but its 3-5 year durability depends on turning reusable licensing work and supplier relationships into projects before better-capitalized nuclear and power incumbents secure AI-load contracts. AI materially expands the addressable need for firm, carbon-free power, but it is only an indirect tailwind until hyperscalers or utilities sign PPAs; rising 5.07% 10-year Treasury yields also raise the hurdle rate for capital-intensive projects.

⚡Key drivers
Bull case
  • NuScale holds the only NRC-approved SMR design, and management estimates reusable COLA work could cover 50%-60% of future domestic project effort.
  • Doosan has begun first-article module fabrication, while more than 60 specialized suppliers are engaged and management is adding dual or tertiary sourcing.
  • Liquidity expanded to $1.9B by Q3 2026, compared with $446.7M of cash and investments at 2024 year-end, giving the company capacity to fund engineering and long-lead work.
  • The stock is 85.7% below its $23.35 52-week high, leaving material upside if an actual order validates the AI and industrial-power demand narrative.
Bear case
  • Q3 2026 revenue was only $0.3M, versus $8.2M in Q3 2025, and management gave no formal financial guidance, binding-order date, TVA PPA date, or OEM-agreement date.
  • The equity trades at 573.05x TTM P/S, versus a 2.2x peer average, despite FY2025 operating margin of -265.2% and no meaningful P/E.
  • LTM free cash flow was -$0.6B through September 30, 2026, while management expects operating expenses to remain about $65M per quarter before commercial revenue arrives.
  • The shares are down 63.94% in three months and remain 65.8% below the 200-day average, while 74.72% short interest signals both acute skepticism and high volatility.
⌗Key metrics
MetricValueContext
Current price$3.35Engine reference price as of November 20, 2026
Quant price target$3.33-0.6% versus current; High confidence; sales_quality_blend basis
Market capitalization$1.6BCurrent equity value
Revenue$0.0B FY2025253.9% YoY; rounded dataset value remains immaterial to current valuation
EPS-$4.34 FY202526.5% YoY
Operating margin-265.2% FY2025Improved from -374.5% in prior FY, but remains deeply negative
EBITDA-$0.3B LTM to 2026-09-30No EBITDA-based valuation support
Free cash flow-$0.6B LTM to 2026-09-30Cash use remains substantial ahead of commercial revenue
P/S573.05x TTMVersus 2.2x peer average
Liquidity$1.9B Q3 2026Funds first-article, engineering, and licensing activity
Balance sheet0.00 Debt/Equity as of 2026-09-30Current ratio of 24.40 as of 2026-09-30
52-week position-85.7% versus $23.35 highCurrent price is also 65.8% below the $9.81 200-day average
◎How the $3.33 target is built
P/S Multiple$0.17
Quality-adjusted · 20%$3.38
High confidence · sales quality blend blend
⚑Risk & catalyst
Primary risk

The core risk is commercial non-conversion: without a binding order, NuScale must support roughly $65M of quarterly operating expense against just $0.3M of Q3 revenue.

Next catalyst

February 25, 2027 earnings, 97 days away, with investors focused on whether TVA PPA negotiations, an ENTRA1 OEM agreement, or a binding module order has progressed.

⇄Positioning & flows
Short interest74.7% of float · 2.9d to cover · +6.1%
Options GEXpositive regime · flip $3
put wall $3call wall $6

Reported top-three institutional ownership is 175.7%, an economically impossible aggregate that likely reflects overlapping fund and custodial reporting, so it should not be read as true concentrated ownership; insiders own 11.2%. Short interest of 97.24M shares, or 74.72% of the float, with 2.9 days to cover, makes the stock unusually exposed to order-driven squeezes. Near-term options gamma is positive and the zero-gamma level is $3.20, just below spot, which may dampen moves around that level until a fundamental catalyst breaks it; call and put wall data were unavailable.

▦Segments
Project-development, engineering and licensing revenueNot separately disclosed; $0.3M in Q3 2026

Revenue is currently project based rather than recurring; Q3 revenue fell from $8.2M as RoPower Phase 2 FEED work did not recur.

Romania, RoPower development

The planned six-module, 462 MW final investment decision targeted for Q4 2025 has not been completed; timing now depends on engagement with Romania's new administration.

Future U.S. module and OEM activityNo current module-sales revenue disclosed

TVA PPA discussions are the near-term commercial priority, with an OEM module agreement expected only after subsequent engineering and COLA work.

▤Latest earnings call · Q3 2026

Manufacturing readiness advanced, but no binding customer order or formal financial guidance was provided.

Call sentiment 48/100
“Management

Management has delivered a mixed record. In the 2024 Q4 call, it targeted an NRC 77 MWe/module uprate review by mid-2025, a RoPower final investment decision for six modules and 462 MW in Q4 2025, and long-lead work for 12 modules aimed at 2030 delivery. By Q3 2026, RoPower timing remained uncertain under Romania's new administration, the current milestone was first-article fabrication with Doosan rather than a disclosed customer order, and the earlier 12-module pipeline still had not converted into announced allocations. Financially, Q4 2024 revenue was $34.2M and quarterly operating expense was $43.0M, compared with Q3 2026 revenue of $0.3M and operating expense of $65M. The recent earnings record contains two enormous misses, including -1,225.0% in Q3 2025 and -700.0% in Q1 2026, followed by modest Q2 and Q3 2026 beats. Liquidity execution has improved, but commercial-timeline credibility is weak.

Manufacturing
We are proud to have entered into a landmark agreement with Doosan Enerbility to manufacture the first article production of the NuScale power module, representing a clear transition from preparation to execution.
— John Hopkins, CEO · Q3 2026 earnings call
Quarter results
NuScale reported revenue of $0.3 million for the 3 months ending September 30, 2026, compared to $8.2 million in the third quarter last year.
— Robert Hamady, CFO · Q3 2026 earnings call
Liquidity
As we begin to fund first article fabrication activity with Doosan and continue to advance engineering and licensing readiness ahead of an ENTRA1 OEM agreement, we have adequate liquidity to fund these activities, and we expect capital deployment to continue at a measured and disciplined pace.
— Robert Hamady, CFO · Q3 2026 earnings call
OpEx outlook
While we don't provide guidance as a rule, and we have not in the past, our OpEx should remain fairly constant.
— Robert Hamady, CFO · Q3 2026 earnings call
Margin outlook
Once we have an order, we work on an OEM agreement, we'll have further clarity on margins. These agreements are longer delivery schedules, but this is part of a deliberate business plan.
— Robert Hamady, CFO · Q3 2026 earnings call
◈Moat & edge

NuScale's strongest protection is regulatory: it is the only SMR design with NRC approval, and reusable COLA work could reduce domestic project time and cost by 50%-60%. Doosan fabrication, Framatome fuel support, Paragon controls, and a supplier base exceeding 60 firms add manufacturing know-how and qualification depth. The moat is not yet economic because no customer has committed to buy modules, and rival designs or utility-scale alternatives can still win the offtake contracts that determine returns.

⊞Capital allocation

Capital allocation is directed toward first-article fabrication, engineering, licensing readiness, and long-lead inventory that will sit in work-in-progress until module sales occur. The company reports no debt, and deep-dive data show $0.0B of buybacks, dividends, and capex, so shareholders are not receiving cash returns while commercial work is funded. Management calls deployment measured and disciplined, but that discipline must be judged against LTM free cash flow of -$0.6B, not against a mature-company payout framework.

∎The bottom line

SMR rates a SELL at Medium conviction for 6-12 months. The company owns meaningful regulatory and manufacturing assets, but investors are paying for commercial certainty that management has not supplied. The downside case is moderated by $1.9B of liquidity, a price already near the 52-week low, and extreme short positioning. A binding customer order with disclosed economics, followed by a credible delivery schedule, would change the rating; another quarter of nominal revenue and unchanged contract timing would reinforce it.

≣ Full research note tap to expand

Executive Summary

SELL, Medium conviction. Rated SELL, Medium conviction for the next 6-12 months. NuScale has moved first-article module work from planning toward fabrication, but the equity still rests on uncontracted future projects rather than recurring economics. The 85.7% fall from the 52-week high improves the trading setup, not the underlying proof burden.

Investment Thesis

NuScale is a financing-supported technology option, not yet an operating power-equipment business. The market is pricing an eventual fleet of modules, recurring engineering revenue, and AI-linked demand for firm power. What remains missing is the contract that converts those possibilities into a revenue schedule, margin profile, and cash-pay timeline. The valuation is especially hard to defend because TTM P/S is 573.05x, versus 2.2x for peers, while the comparable set itself is a poor valuation anchor: peer P/E averages 14.5x but spans a 7.8x dispersion and includes businesses with established earnings that NuScale does not possess.

The positive case is tangible, not imaginary. NuScale has regulatory lead time, a deep manufacturing ecosystem, and enough liquidity to move from design readiness into fabrication. Those are valuable assets in a market where utilities and hyperscalers increasingly need dispatchable, carbon-free capacity. But nuclear development does not monetize when designs are approved or suppliers are engaged. It monetizes when a creditworthy customer signs an offtake structure, construction starts, and modules are delivered at a return above their accumulated engineering and inventory costs. Management explicitly says margin clarity comes only once an order and OEM agreement exist.

The shares have already suffered a severe reset, falling from $23.35 to $3.35 over the 52-week range. That limits enthusiasm for pressing a short on price momentum alone and explains the near-term HOLD stance. It does not create a reason to own the stock outright. The heavily shorted float can produce abrupt upside on any commercial announcement, but that is a catalyst trade rather than evidence of intrinsic earnings power.

The SELL rests on three requirements that are presently unfulfilled: a binding TVA or other customer order, disclosed unit economics and margin terms, and evidence that the commercial program can grow without persistent large cash outflows. Until those arrive, the market is valuing an option on a successful SMR rollout as though commercial conversion were substantially de-risked. It is not.

Key Metrics

MetricValueContext
Current price$3.35Engine reference price as of November 20, 2026
Quant price target$3.33-0.6% versus current; High confidence; sales_quality_blend basis
Market capitalization$1.6BCurrent equity value
Revenue$0.0B FY2025253.9% YoY; rounded dataset value remains immaterial to current valuation
EPS-$4.34 FY202526.5% YoY
Operating margin-265.2% FY2025Improved from -374.5% in prior FY, but remains deeply negative
EBITDA-$0.3B LTM to 2026-09-30No EBITDA-based valuation support
Free cash flow-$0.6B LTM to 2026-09-30Cash use remains substantial ahead of commercial revenue
P/S573.05x TTMVersus 2.2x peer average
Liquidity$1.9B Q3 2026Funds first-article, engineering, and licensing activity
Balance sheet0.00 Debt/Equity as of 2026-09-30Current ratio of 24.40 as of 2026-09-30
52-week position-85.7% versus $23.35 highCurrent price is also 65.8% below the $9.81 200-day average

Financial Strength

The balance sheet is the central offset to an otherwise speculative operating profile. Zero debt and a 24.40 current ratio provide unusual flexibility for a pre-commercial nuclear developer, and the $1.9B liquidity position should cover near-term first-article and licensing activity. That strength does not equal self-funding: negative free cash flow and losses mean the company has runway, not demonstrated cash generation. Reported LTM operating and net margins are distorted by de minimis revenue, so margin improvement cannot be assessed credibly until module contracts establish cost absorption and pricing.

Competitive Position

NuScale's strongest protection is regulatory: it is the only SMR design with NRC approval, and reusable COLA work could reduce domestic project time and cost by 50%-60%. Doosan fabrication, Framatome fuel support, Paragon controls, and a supplier base exceeding 60 firms add manufacturing know-how and qualification depth. The moat is not yet economic because no customer has committed to buy modules, and rival designs or utility-scale alternatives can still win the offtake contracts that determine returns.

Management & Guidance

Management did not provide formal revenue, EBITDA, cash-flow, or margin guidance. Its only quantitative near-term operating guide is approximately $65M of quarterly operating expense, alongside 13 E2 centers globally and ongoing domestic COLA reuse work. The absence of a schedule for the TVA PPA, ENTRA1 OEM agreement, or binding module order makes that guidance useful for measuring cash discipline but insufficient for underwriting commercial revenue. Credibility is constrained by missed prior project timing, especially the RoPower Q4 2025 FID target.

Segment Analysis

  • Project-development, engineering and licensing revenue (Not separately disclosed; $0.3M in Q3 2026): Revenue is currently project based rather than recurring; Q3 revenue fell from $8.2M as RoPower Phase 2 FEED work did not recur.
  • Romania, RoPower development (Not disclosed): The planned six-module, 462 MW final investment decision targeted for Q4 2025 has not been completed; timing now depends on engagement with Romania's new administration.
  • Future U.S. module and OEM activity (No current module-sales revenue disclosed): TVA PPA discussions are the near-term commercial priority, with an OEM module agreement expected only after subsequent engineering and COLA work.

Capital Allocation

Capital allocation is directed toward first-article fabrication, engineering, licensing readiness, and long-lead inventory that will sit in work-in-progress until module sales occur. The company reports no debt, and deep-dive data show $0.0B of buybacks, dividends, and capex, so shareholders are not receiving cash returns while commercial work is funded. Management calls deployment measured and disciplined, but that discipline must be judged against LTM free cash flow of -$0.6B, not against a mature-company payout framework.

Management Execution & Track Record

Management has delivered a mixed record. In the 2024 Q4 call, it targeted an NRC 77 MWe/module uprate review by mid-2025, a RoPower final investment decision for six modules and 462 MW in Q4 2025, and long-lead work for 12 modules aimed at 2030 delivery. By Q3 2026, RoPower timing remained uncertain under Romania's new administration, the current milestone was first-article fabrication with Doosan rather than a disclosed customer order, and the earlier 12-module pipeline still had not converted into announced allocations. Financially, Q4 2024 revenue was $34.2M and quarterly operating expense was $43.0M, compared with Q3 2026 revenue of $0.3M and operating expense of $65M. The recent earnings record contains two enormous misses, including -1,225.0% in Q3 2025 and -700.0% in Q1 2026, followed by modest Q2 and Q3 2026 beats. Liquidity execution has improved, but commercial-timeline credibility is weak.

Positioning & Flows

Reported top-three institutional ownership is 175.7%, an economically impossible aggregate that likely reflects overlapping fund and custodial reporting, so it should not be read as true concentrated ownership; insiders own 11.2%. Short interest of 97.24M shares, or 74.72% of the float, with 2.9 days to cover, makes the stock unusually exposed to order-driven squeezes. Near-term options gamma is positive and the zero-gamma level is $3.20, just below spot, which may dampen moves around that level until a fundamental catalyst breaks it; call and put wall data were unavailable.

Bull Case

  • NuScale holds the only NRC-approved SMR design, and management estimates reusable COLA work could cover 50%-60% of future domestic project effort.
  • Doosan has begun first-article module fabrication, while more than 60 specialized suppliers are engaged and management is adding dual or tertiary sourcing.
  • Liquidity expanded to $1.9B by Q3 2026, compared with $446.7M of cash and investments at 2024 year-end, giving the company capacity to fund engineering and long-lead work.
  • The stock is 85.7% below its $23.35 52-week high, leaving material upside if an actual order validates the AI and industrial-power demand narrative.

Bear Case

  • Q3 2026 revenue was only $0.3M, versus $8.2M in Q3 2025, and management gave no formal financial guidance, binding-order date, TVA PPA date, or OEM-agreement date.
  • The equity trades at 573.05x TTM P/S, versus a 2.2x peer average, despite FY2025 operating margin of -265.2% and no meaningful P/E.
  • LTM free cash flow was -$0.6B through September 30, 2026, while management expects operating expenses to remain about $65M per quarter before commercial revenue arrives.
  • The shares are down 63.94% in three months and remain 65.8% below the 200-day average, while 74.72% short interest signals both acute skepticism and high volatility.

Valuation & Price Target

Engine price target $3.33 (-0.6% vs current), High confidence.

  • P/S Multiple: $0.17 (0% weight)
  • Quality-adjusted: $3.38 (20% weight)

The quant engine's HOLD and $3.33 target, only -0.6% from $3.35, appropriately capture the balance between liquidity and current price. This note moves to SELL because the quality-adjusted method at $3.38 embeds value for a commercial path that has not yet produced a binding order, while the P/S method yields only $0.17 and peer P/E dispersion is a wide 7.8x. The 51/100 quality score and 53/100 moderate risk score support a non-extreme view, hence Medium rather than High conviction. Sell-side Hold consensus is low-signal context only and does not drive the call.

Risk Assessment

Risk score 53/100 (Moderate). The core risk is commercial non-conversion: without a binding order, NuScale must support roughly $65M of quarterly operating expense against just $0.3M of Q3 revenue.

The Bottom Line

SMR rates a SELL at Medium conviction for 6-12 months. The company owns meaningful regulatory and manufacturing assets, but investors are paying for commercial certainty that management has not supplied. The downside case is moderated by $1.9B of liquidity, a price already near the 52-week low, and extreme short positioning. A binding customer order with disclosed economics, followed by a credible delivery schedule, would change the rating; another quarter of nominal revenue and unchanged contract timing would reinforce it.

Go deeper in the app

Live charts, options analytics, the full earnings-call breakdown, price alerts, and every other stock — updated in real time.

Get Tickr